Providing EPC Services to ISK Chemicals Pte Ltd for ISK Cogeneration (10MW, 68TPH Steam)Power Plant Project at ISK at Tuas
Powered by two natural gas turbines (2 x 5MW), the flue gas (exhaust) was directed to a Heat Recovery Steam Generator (HRSG) that produces steam 68 tonnes per hour at 14 bar. This project consists of partial engineering design, equipment supply and all mechanical and electrical hook-up work as follows:
– Equipment installation and erection including Gas Turbine System including Gas Turbine body, filter housing, platform and other accessories, diverter damper, furnace, evaporator, economizer, duct burner, gas train, bypass stack, main stack, transformer, tanks, pump skids, transition and interconnecting ducts etc
– Supply and installation of HRSG
– EPC of Mechanical Balance of Plan including Blowdown System, Air Receiver Tank, Piping and Pipe Rack Works (including Natural Gas Pipe, Steam Pipe, Compressed Air Pipe, Cooling Water Pipe, Boiler Feed Water Pipe, Chemical Dosing Pipe, Blowdown & Drain-off Pipe, Sampling Line, Instrument Air Tubing etc)
– EPC of Electrical Balance of Plant works including transformer switchgear, cabling work.

About ISK Chemicals Pte Ltd
Ishihara Sangyo Kaisha (ISK) manufacturers titanium dioxide in Tuas.